Home › Vector tools › Seismic Positioning Data Importer
Seismic Positioning Data Importer QGIS 4 compatibility
Not QGIS 4 ready Quiet
Not yet — the latest version declares max QGIS version 3.99.0, so it is not offered to QGIS 4 users.
This plugin imports Seismic Positioning or Navigation data from various formats such as P1/11 (P111), P1/90 (P190), SPS.
About
This plugin is used to import Seismic Positioning data in published data exchange formats such as P1/11, P1/90 or SPS. It loads the data in csv (for points) and shapefiles (for lines).
| Author | Gurpreet Singh |
|---|---|
| Downloads | 8,122 |
| Latest version | 0.5 |
| Last updated | 2025-04-24 (539 days ago) |
| Min QGIS | 3.0.0 |
| Max QGIS | 3.99.0 |
| QGIS 4 ready | No |
| Maintenance | Quiet |
| Category | Vector tools |
| Tags | vector, shapefile, seismic, import, p1/11, p1/90, p111, sps, p190 |
Homepage · Repository · Issue tracker · Official page
Alternatives in Vector tools
- HCMGISQGIS 4 ready
HCMGIS - Basemaps, Download OpenData, Batch Converter, VN-2000 Projections, and Field Calculation Utilities
- mmqgisQGIS 4 ready
A collection of QGIS vector layer operation plugins
- Shape ToolsQGIS 4 ready
Shape Tools is a collection of geodesic shapes and tools. Create circle, ellipse, line of bearing, points along a line of bearing, concentri
Related plugins
- P1/90 ImportNot QGIS 4 ready
Read UKOOA P1/90 files
- GNSSeismicQGIS 4 ready
Plugin bilingüe (ES/EN) para topografía RTK/GNSS y sísmica: proyectos con base de datos PREPLOT/POSTPLOT, importación de .dc aplicando un mo
- CSV ImporterQGIS 4 ready
Drag and drop CSV files and save them as point GeoPackage or Shapefile layers.
- QBeachballNot QGIS 4 ready
Easily plot focal mechanisms (beachballs) onto a map.
- EarthDailyNot QGIS 4 ready
Discover, request and use imagery products based on virtual constellation within QGIS, using the EarthDaily® Platform capabilities.
- OSM Data ToolkitQGIS 4 ready
Download OpenStreetMap data for an area of interest and export it as organised GeoPackage or Shapefile layers.
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.