QGIS Plugin Tracker

Home › Utilities › QGIS Python IDE Pro

QGIS Python IDE Pro QGIS 4 compatibility

QGIS 4 ready Active

Yes — QGIS Python IDE Pro supports QGIS 4 (declared max version 4.99.0).

A professional, modular Python IDE for QGIS 4 / Qt6: multi-format code editor, dynamic PyQGIS language service, live diagnostics with quick fixes, integrated Qt Designer, Markdown preview, QSS/XML/TXT formatting, snippets, project-wide search, UI translations, and a multilingual extension system.

About

A fast, JetBrains-inspired IDE for QGIS 4 (Qt6). Edit Python, Markdown, QSS, XML/UI, TXT and config files with syntax highlighting, code folding, contextual completion, type inference and one-click quick fixes powered by a dynamic PyQGIS API index. Includes an integrated Qt Designer, live Markdown preview, QSS/XML/TXT beautifiers, code snippets and wizard, built-in Python console with structured logging, project-wide search, command palette, window layout persistence and full UI localization (IT, EN, DE, ES, FR). A modular extension framework ships with five ready-to-use extensions, each with per-language translation catalogs that follow the IDE language at runtime: Local History (automatic file snapshots with rotation, restore and preview), TODO Control Menu (dock panel scanning the project for TODO/FIXME/XXX/HACK markers with one-click jump-to-line), i18n Checker (cross-references translation keys used in code against the project JSON catalogs, with a warning when no project is open), Session Manager (save, restore and delete sets of open tabs) and Bookmarks (per-line bookmarks with quick navigation).

AuthorDr. Geol. Faustino Cetraro
Downloads218
Latest version1.1.0
Last updated2026-10-06 (9 days ago)
Min QGIS4.0.0
Max QGIS4.99.0
QGIS 4 readyYes
MaintenanceActive
CategoryUtilities
Tagspython, pyqgis, ide, qt6, development, language-service, qss, xml, markdown, extensions, i18n, productivity

Homepage · Repository · Issue tracker · Official page

Alternatives in Utilities

Related plugins

Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.