QGIS Plugin Tracker

Home › Raster & terrain › MAS Spatial Analysis Tool

MAS Spatial Analysis Tool QGIS 4 compatibility

QGIS 4 ready Active

Yes — MAS Spatial Analysis Tool supports QGIS 4 (declared max version 4.99.0).

Comprehensive DEM analysis toolkit with 45+ hydrological, geomorphometric, and stream network tools. Numba-accelerated for fast processing.

About

Professional-grade terrain analysis toolkit for QGIS featuring: • Hydrological Analysis: D8 flow direction, flow accumulation, watershed delineation, depression filling, flow indices (TWI, SPI), flow distance/length, basin analysis • Geomorphometric Analysis: Slope, aspect, curvature, hillshade, roughness, TPI, openness, visibility analysis, hypsometric analysis • Stream Network: Stream extraction, Strahler/Shreve ordering, stream links, vectorization, gap joining, valley extraction • Structured Workflow: Organized tools following standard hydrology analysis workflow Key Features: - Numba JIT acceleration for 10-100x faster processing - Standard D8 flow direction encoding (industry-compatible) - Automatic symbology for flow direction and stream order - NoData handling with -9999 standard How to Use: 1. Open Processing Toolbox (Ctrl+Alt+T) 2. Expand "MAS Spatial Analysis Tool" 3. Select algorithm category (Hydrological, Geomorphometric, Stream Network) 4. Double-click tool to run 5. Typical workflow: Fill DEM → Flow Direction → Flow Accumulation → Extract Streams

AuthorMirjan Ali Sha
Downloads4,501
Latest version1.2.2
Last updated2026-08-30 (46 days ago)
Min QGIS3.0.0
Max QGIS4.99.0
QGIS 4 readyYes
MaintenanceActive
CategoriesRaster & terrain, Spatial analysis, Hydrology & water
Tagsdem, processing, terrain, direction, stream, hillshade, watershed, accumulation, geomorphology, slope, flow, hydrology, aspect, curvature, numba, spatial-analysis, stream-network-analysis, hydrological-analysis, geomorphometric-analysis

Homepage · Repository · Issue tracker · Official page

Alternatives in Raster & terrain

Related plugins

Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.