Home › Web maps & export › GeoCSV
GeoCSV QGIS 4 compatibility
Not QGIS 4 ready Likely abandoned
Not yet — the latest version declares max QGIS version 3.99.0, so it is not offered to QGIS 4 users.
This plugin creates a vector layer from the loaded csv file to make it available to edit
About
GeoCSV usage: 1) Add Delimited Text Layer via Layer->Add Layer->Add Delimited Text Layer... 2) Open GeoCSV plugin window via Plugins->GeoCSV 3) Select a Delimited Text Layer you want to transform to Temporary Vector Layer 4) Click "OK" 5) Enjoy!
| Author | Andrey Kolomatskiy |
|---|---|
| Downloads | 15,213 |
| Latest version | 1.0 |
| Last updated | 2022-12-13 (1402 days ago) |
| Min QGIS | 3.0.0 |
| Max QGIS | 3.99.0 |
| QGIS 4 ready | No |
| Maintenance | Likely abandoned |
| Category | Web maps & export |
| Tags | python, csv |
Homepage · Repository · Issue tracker · Official page
Alternatives in Web maps & export
- qgis2webQGIS 4 ready
Export to an OpenLayers/Leaflet webmap
- Qgis2threejsQGIS 4 ready
3D map visualization and web export powered by three.js JavaScript library
- KML ToolsQGIS 4 ready
Fast KML/KMZ importer, exporter, with description field expansion and ground overlay to GeoTIFF conversions.
Related plugins
- GeoFlight PlannerQGIS 4 ready
A versatile QGIS plugin for drone flight planning, ensuring optimized flight paths and high-quality data capture.
- 02CadGis Universal CAD/GIS ImporterQGIS 4 ready
Convert AutoCAD DWG/DXF, Netcad NCZ/NCA drawings, KML/KMZ, GML, GeoJSON, CSV, SpatiaLite, GPX, DGN, and GDB datasets directly into optimized
- CSV ToolsNot QGIS 4 ready
Adds new processing algorithms and models that deal with CSV files
- CSV Batch ImportNot QGIS 4 ready
Batch import of CSV vector layers
- Online Map LinkerQGIS 4 ready
This plugin generates links from point features to online maps.
- CSV Geometry ExportQGIS 4 ready
Export vector layers as CSV with multiple geometry formats (WKT, WKB, GeoJSON, KML, Earth Engine, X-Y coordinates). Part of MAS Vector Proce
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.