Home › Vector tools › Fill Gaps
Fill Gaps QGIS 4 compatibility
Not QGIS 4 ready Active
Not yet — the latest version declares max QGIS version 3.99.0, so it is not offered to QGIS 4 users.
This plugin is intended to fill gaps and holes in a polygon layer.
About
Download the manual from the homepage, which contains important information and examples. To run the plugin, go to Toolbox -> Topology -> Fill Gaps Ver. 0.1.
| Author | Antonio Sobral Almeida |
|---|---|
| Downloads | 1,952 |
| Latest version | 0.1 |
| Last updated | 2025-10-31 (349 days ago) |
| Min QGIS | 3.40.0 |
| Max QGIS | 3.99.0 |
| QGIS 4 ready | No |
| Maintenance | Active |
| Category | Vector tools |
| Tags | vector, shapefile, geometry, polygon, holes, gaps |
Homepage · Repository · Issue tracker · Official page
Alternatives in Vector tools
- HCMGISQGIS 4 ready
HCMGIS - Basemaps, Download OpenData, Batch Converter, VN-2000 Projections, and Field Calculation Utilities
- mmqgisQGIS 4 ready
A collection of QGIS vector layer operation plugins
- Shape ToolsQGIS 4 ready
Shape Tools is a collection of geodesic shapes and tools. Create circle, ellipse, line of bearing, points along a line of bearing, concentri
Related plugins
- cartogram3QGIS 4 ready
Generate anamorphic maps
- Geometry ComparatorNot QGIS 4 ready
Detects changes between two vector layers (Polygon, Line or Point) by comparing features based on a Unique ID field and their geometries, id
- Polygon CompareNot QGIS 4 ready
Compares two polygon layers to find added, deleted and modified polygons by unique ID and geometry
- TopolinerQGIS 4 ready
Topology check, cleanup and coverage model for polygon and line layers: snapping, missing nodes, dangles and overshoots, assembly check, top
- Mappia PublisherNot QGIS 4 ready
Share your maps online (raster and shape) as a profissional. Easily make your QGIS maps online 24/7 (for free, no private server required).
- AnaximandreQGIS 4 ready
A plugin for auto drawing 3D Shapefiles from topographical survey.
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.