Home › Spatial analysis › EZ Piezo
EZ Piezo QGIS 4 compatibility
Not QGIS 4 ready Active
Not yet — the latest version declares max QGIS version 3.99.0, so it is not offered to QGIS 4 users.
Generate piezometric maps (groundwater contour lines) by Ordinary Kriging from CSV well data.
About
A QGIS plugin for generating piezometric maps (isopiezes) through Ordinary Kriging interpolation. Load your data from a CSV file or enter it manually, configure the variogram, and get an interpolated raster and vector contour lines directly in QGIS. Includes cross-validation (LOO), flow vectors, and major/minor contour styling.
| Author | Hugo LEBEL |
|---|---|
| Downloads | 805 |
| Latest version | 1.4.2 |
| Last updated | 2026-08-21 (55 days ago) |
| Min QGIS | 3.16.0 |
| Max QGIS | 3.99.0 |
| QGIS 4 ready | No |
| Maintenance | Active |
| Categories | Spatial analysis, Raster & terrain, Hydrology & water |
| Tags | contour, kriging, isopiezes, piezometry, groundwater, hydrogeology, interpolation |
Homepage · Repository · Issue tracker · Official page
Alternatives in Spatial analysis
- Group StatsQGIS 4 ready
Stats and analysis for vector layers data
- Data PlotlyQGIS 4 ready
D3 Plots for QGIS
- CrayfishQGIS 4 ready
Tools for mesh layers QGIS
Related plugins
- Isoliner - грид и изолинииQGIS 4 ready
2D kriging (GSLIB KB2D) and isoline / contour-polygon generation in QGIS. Кригинг 2D (GSLIB KB2D) и построение изолиний/контурных полигонов
- ArchToolkitQGIS 4 ready
Integrated archaeology toolkit for QGIS covering terrain, visibility, cost, networks, AHP suitability, trench planning, geology, and AOI rep
- MidvattenQGIS 4 ready
A toolset that makes QGIS an interface for editing/viewing hydrogeological observational data (drillings, water levels, seismic data etc) st
- GEAQUA Capture ZonesQGIS 4 ready
Analytical delineation of groundwater time-of-travel capture zones for a single pumping well.
- Draw CatchmentsNot QGIS 4 ready
A QGIS tool for drawing preliminary groundwater catchment areas from groundwater contours.
- EarthWorkQQGIS 4 ready
Earthwork quantities for sites and road corridors: weighted grid integration and end-area sections, void-ratio volume conversion, daylighted
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.