Home › Spatial analysis › Elephant Heatmap KDE
Elephant Heatmap KDE QGIS 4 compatibility
Not QGIS 4 ready Active
Not yet — the latest version declares max QGIS version 3.99.0, so it is not offered to QGIS 4 users.
KDE heatmap from elephant presence points with automatic quantile classification and blue-to-red symbology.
About
Plugin developed at Pendjari National Park (W-Arly-Pendjari Complex, Benin) for wildlife conservation teams. Generates a Kernel Density Estimation (KDE) heatmap from GPS/presence point data, with dynamic 7-class quantile classification and consistent blue-to-red symbology. Default bandwidth of 5,000 m calibrated for Pendjari elephant home range (~130 km2).
| Author | Marie-Michaire LIMA |
|---|---|
| Downloads | 286 |
| Latest version | 1.7.0 (experimental) |
| Last updated | 2026-04-19 (179 days ago) |
| Min QGIS | 3.16.0 |
| Max QGIS | 3.99.0 |
| QGIS 4 ready | No |
| Maintenance | Active |
| Category | Spatial analysis |
| Tags | wap, heatmap, elephant, kde, pendjari, raster, wildlife, conservation, density |
Homepage · Repository · Issue tracker · Official page
Alternatives in Spatial analysis
- Group StatsQGIS 4 ready
Stats and analysis for vector layers data
- Data PlotlyQGIS 4 ready
D3 Plots for QGIS
- CrayfishQGIS 4 ready
Tools for mesh layers QGIS
Related plugins
- Species ExplorerQGIS 4 ready
Quickly fetch and visualize species occurrence data from GBIF.
- Density AnalysisQGIS 4 ready
This plugin automates the creation of density heatmaps in QGIS with a heatmap explorer to examine the areas of greatest concentrations. It i
- Fast Density AnalysisNot QGIS 4 ready
A fast kernel density visualization plugin for geospatial analytics
- Iterative Density AnalysisNot QGIS 4 ready
Iterative kernel density analysis for points and lines with mosaic merging.
- TerraLinkNot QGIS 4 ready
Spatial ecology tool for wildlife corridor generation and habitat connectivity analysis using raster and vector workflows. Strategically con
- SDMQGIS 4 ready
A guided wizard for species distribution modeling, from aligning modeling variables to ensemble predictions and generating SDM reports.
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.