Home › Hydrology & water › CoastERA Toolkit
CoastERA Toolkit QGIS 4 compatibility
QGIS 4 ready Active
Yes — CoastERA Toolkit supports QGIS 4 (declared max version 4.99.0).
Advanced ERA5 Data Integrator for Coastal Engineering (Compatible with QGIS 4.0)
About
Downloads and processes ERA5 wave and wind data for coastal engineering inputs. Fully compatible with QGIS 4.0.
| Author | Mohamed Aly Nasef |
|---|---|
| Downloads | 1,102 |
| Latest version | 1.2.1 |
| Last updated | 2026-09-13 (32 days ago) |
| Min QGIS | 3.22.0 |
| Max QGIS | 4.99.0 |
| QGIS 4 ready | Yes |
| Maintenance | Active |
| Category | Hydrology & water |
| Tags | era5, metocean, wave, wind, engineering |
Homepage · Repository · Issue tracker · Official page
Alternatives in Hydrology & water
- CrayfishQGIS 4 ready
Tools for mesh layers QGIS
- ArcGeek CalculatorQGIS 4 ready
ArcGeek Calculator is a QGIS plugin that provides a comprehensive set of tools for coordinate calculations, conversions, spatial operations,
- TUFLOWQGIS 4 ready
A collection of utilities for TUFLOW flood and coastal simulation in QGIS
Related plugins
- oceanum-datameshQGIS 4 ready
Search, query, load and display Oceanum Datamesh ocean & environmental data directly in QGIS.
- Rain to Flood AnalysisQGIS 4 ready
Rainfall-to-flood analysis for QGIS. Delineates the upstream catchment and longest flow path from a single pour point, downloads and analyse
- Evapotranspiration CalculatorNot QGIS 4 ready
Estimate daily potential evapotranspiration (ET₀) using the Hargreaves formula and ERA5 reanalysis temperature data from the Copernicus Clim
- Subsea Cable ToolsQGIS 4 ready
Tools to support working with subsea cable data in QGIS.
- HydroSizerNot QGIS 4 ready
Auditable hydraulic pipe sizing for water distribution networks using QGISRed or compatible simulation results.
- QEHT Engineering HydrologyQGIS 4 ready
Road-drainage and catchment hydrology from a DEM, computed entirely inside QGIS: no external executables, no extra Python packages.
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.