Home › Cartography & layout › Bulk vector export as SLD and GeoJson
Bulk vector export as SLD and GeoJson QGIS 4 compatibility
QGIS 4 ready Active
Yes — Bulk vector export as SLD and GeoJson supports QGIS 4 (declared max version 4.99.0).
Export all vector layers as GeoJSON and SLD.
About
This plugin exports all vector layers as GeoJSON with their SLD styling. Active raster layers are exported according to their position in the layer stack as multiband GeoTIFFs. The resulting files are zipped into a file named after the QGIS project. The layer order and additional information is stored in a metadata.json. Basemap PNG tiles are ignored at export.
| Author | Simon Oberhammer, Günter Hack |
|---|---|
| Downloads | 41,120 |
| Latest version | 0.7.4 |
| Last updated | 2026-10-05 (10 days ago) |
| Min QGIS | 3.10.3 |
| Max QGIS | 4.99.0 |
| QGIS 4 ready | Yes |
| Maintenance | Active |
| Categories | Cartography & layout, Raster & terrain, Web maps & export |
| Tags | vector, sld, export, geotiff, raster, style, crs |
Homepage · Repository · Issue tracker · Official page
Alternatives in Cartography & layout
- LF ToolsQGIS 4 ready
Comprehensive solutions for cartographic production, surveying, drone mapping, GNSS data import, geospatial database management, digital ima
- MaskQGIS 4 ready
Help to create mask, filter labels in it
- TimeManagerQGIS 4 ready
Create animations visualizing spatio-temporal data
Related plugins
- KML Style ImporterNot QGIS 4 ready
Extract style definitions from KML files
- GeoCat BridgeQGIS 4 ready
Easy publication of data and metadata from QGIS.
- SLD4rasterNot QGIS 4 ready
Generates SLD (Styled Layer Descriptor) for raster layers.
- WFS Styler PluginQGIS 4 ready
Set a WMS style to a WFS layer
- GeoServer ManagerQGIS 4 ready
Manage a GeoServer from QGIS: workspaces, stores, layers, styles, tile cache and settings.
- Export 2KMLQGIS 4 ready
Batch‐export vector and raster layers into a single KML or KMZ with QGIS styling. Part of MAS Vector Processing tools.
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.