Home › Vector tools › Swap Vector Direction
Swap Vector Direction QGIS 4 compatibility
Not QGIS 4 ready Likely abandoned
Not yet — the latest version declares max QGIS version 3.99.0, so it is not offered to QGIS 4 users.
Swap Vector Direction reverse the direction of a vector Fr : SwapVectorDirection permet d'inverser la direction d'un vecteur
About
This plugin allows to reverse the direction of a vector in a row or multi-row. Fr : Ce plugin permet d'inverser la direction d'un vecteur dans une couche ligne ou multiligne.
| Author | Christophe Maginot |
|---|---|
| Downloads | 59,657 |
| Latest version | 0.9 |
| Last updated | 2018-09-06 (2961 days ago) |
| Min QGIS | 3.0.0 |
| Max QGIS | 3.99.0 |
| QGIS 4 ready | No |
| Maintenance | Likely abandoned |
| Category | Vector tools |
| Tags | geometry, vector, swap, direction, reverse |
Homepage · Repository · Issue tracker · Official page
Alternatives in Vector tools
- HCMGISQGIS 4 ready
HCMGIS - Basemaps, Download OpenData, Batch Converter, VN-2000 Projections, and Field Calculation Utilities
- mmqgisQGIS 4 ready
A collection of QGIS vector layer operation plugins
- Shape ToolsQGIS 4 ready
Shape Tools is a collection of geodesic shapes and tools. Create circle, ellipse, line of bearing, points along a line of bearing, concentri
Related plugins
- Reverse Flow DirectionNot QGIS 4 ready
This Plugin changes the direction of a polyline feature.
- MiMiGISNot QGIS 4 ready
This plugin contains tools for teaching introductory QGIS.
- GeoBarcelonaNot QGIS 4 ready
Search and zoom to any address in Barcelona city
- Geocoder CartoCiudadQGIS 4 ready
CartoCiudad ofrece direcciones postales, topónimos, poblaciones y límites administrativos de España. || Cartociudad provides postal addresse
- Line direction histogramNot QGIS 4 ready
Create a histogram (rose diagram) of line directions
- MAS Spatial Analysis ToolQGIS 4 ready
Comprehensive DEM analysis toolkit with 45+ hydrological, geomorphometric, and stream network tools. Numba-accelerated for fast processing.
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.