Home › Network & routing › OpenStaR-DT
OpenStaR-DT QGIS 4 compatibility
Not QGIS 4 ready Active
Not yet — the latest version declares max QGIS version 3.99.0, so it is not offered to QGIS 4 users.
Charge un GML au format StaR-DT, applique style et organise en groupe
About
Cette extension permet de charger les données de réponses DT-DICT au format GML StaR-DT afin de les visualiser dans QGIS.
| Author | Camille CHEVRIER |
|---|---|
| Downloads | 1,545 |
| Latest version | 0.1.1 |
| Last updated | 2026-02-18 (239 days ago) |
| Min QGIS | 3.0.0 |
| Max QGIS | 3.99.0 |
| QGIS 4 ready | No |
| Maintenance | Active |
| Category | Network & routing |
| Tags | python, dt-dict, network, star-elec, star-dt |
Homepage · Repository · Issue tracker · Official page
Alternatives in Network & routing
- ORS ToolsQGIS 4 ready
openrouteservice routing, isochrones and matrix calculations for QGIS
- NetworksQGIS 4 ready
Designed as a processing algorithm provider. Manage linear networks and compute multimodal routing and accessibility. Several functionalitie
- TravelTime PluginQGIS 4 ready
Get travel time polygons from the TravelTime API directly from QGIS
Related plugins
- CanaPlan – Réseau AssainissementQGIS 4 ready
Dessin topologique de réseaux EU (rouge), EP (bleu) et eau potable AEP (cyan, symboles StaR-Eau) : conduites, branchements, regards, taboure
- OpenStaR-Elec DéploiementQGIS 4 ready
Create a business environment within an "OpenStaR-Elec Récolement" QGIS profile for mapping electrical networks in StaR-Elec, the new French
- Online Routing MapperNot QGIS 4 ready
Generate routes by using online services (Openrouteservice, GraphHopper ,TomTom, Here, Yandex, Atlas)
- LRSNot QGIS 4 ready
Linear reference system builder and editor
- Disconnected IslandsQGIS 4 ready
Finds disconnected "islands" in a transport network layer, so that a routing tool will work between all nodes. A tolerance field allows for
- Spatial Design Network AnalysisNot QGIS 4 ready
This plugin allows you to use your installation of sDNA from within the QGIS GIS software.
Maintenance: Active = updated within 1 year, Quiet = 1–3 years, Likely abandoned = over 3 years.